Törnikari east side ash fill area
Duration: 5/2023–8/2023
Customer: Fortum Power and Heat Oy
Location: Pori
Description: The project involved constructing the surface structures of the ash filling area at Meri-Pori hydropower plant. The ash filling was shaped, and the surface structures were built on top of it. Additionally, a constructed drainage system directs stormwater generated in the area to the stormwater sewer. The project was implemented as a total contract.
Our assignment included the roles of a supervisor and a safety coordinator.