Pankakoski hydropower plant’s intake pipe bridge renovation
Duration: 5/2024–10/2024
Customer: Kemijoki Oy
Location: Lieksa
Description: The project involves the renovation of the intake pipe bridge at Pankakoski hydropower plant. The renovation includes, among other things, renewing the surface structures of the deck, repairing concrete damage, replacing railings, and encasing intermediate supports. The project implementation method is a total contract.
Our assignment includes supervision of the bridge repair work and acting as the project safety coordinator during construction.