Vanttauskoski bridge renovation

Duration: 3/2025–11/2025

Customer: LAP-ELY / Kemijoki Oy

Location: Rovaniemi

Description: The project involved the renovation of the bridge at the Vanttauskoski hydroelectric power plant. The main repair measures included renewing the surface structures, replacing the edge beams and railings, reshaping the deck with a leveling concrete layer, and repairing the expansion joints. In addition, the contract included repairing damage to concrete structures and making changes to the lighting. The project was carried out as a fixed-price contract.

Our assignment included supervising the bridge repair works.